Surface Preparation

Projects Gallery

Works either fully completed or currently under construction by our application and installation teams.

New York 36St

Trump Tower NYC (Picture - Featured)

Other

Location

By APPOINTMENT ONLY is located in Stamford, CT, as we are regularly out on project location so please call depot in advance to make sure someone will be there to met you, thank you.

Mailing Address:

976 McLean Avenue, Suite 188

Yonkers, NY 10704, USA

Tel: (914) 760-1119

Email

Surface Preparation

Preparation notes tips and tricks from out technical department for the best surface for application.

Doing this step correctly will help eliminate the possibilities of unwanted errors showing through the finished surface. Also the drywall joints should be checked, be they new or old walls and especially the end or "butt" joints.

This step is as important as the application itself, the Wall Primers as this is the bond between the old surface and new material to be applied.

If your walls are old stucco walls then these should be treated in a different manner. Because you are putting an expensive stucco product on these walls greater care will have to be given to them.

For more information or with questions, comments and concerns please contact us at (914)760-1119 thank you.