Application notes tips and tricks geared towards the novice or beginner applicator for this stucco finish. Advanced Veneziano applicators will know how to make the application a little easier due to their experience and this may allow for omitting step 1 below.

We always recommend that you apply a base coat of either Marmocarrara or MarmorinoKS with all of your applications involving Marmoclassic, Marmocarrara, Marmobreccia, Marmodorato, Marmocorallo and Grassello Lucido. This will help with ease of application due to the amount of extra suction added by the base coat.

Step 1:

Apply a first coat of MarmorinoKS or Marmocarrara quite liberally and making sure to keep as many ridges and trowel imperfections out of the base coat as possible. It will be OK to fall back on what you have spread after about 10 minutes and flatten it down a little. This may be White or colored, we recommend colored.

Allow this coat to fully dry over night.

Step 2:

Apply a first coat of colored Stucco Veneziano again making sure to apply quite liberally and at the same time keeping ridges and trowel imperfections out as much as possible.

Allow this coat to dry fully over night.

Step 3:

Apply second coat of Stucco Veneziano but this time it will be applied using less material than in the previous step and again keeping ridges and trowel imperfections to a minimum.

Allow this to dry for about an hour until you cannot see any wet spots, then proceed with the final coat.

This one will be applied much tighter than the previous one. After about each square meter it will be necessary to fall back and begin to burnish, sometimes another applicator will best be suited to carry out this process only. Allow this coat to fully dry over night.

Step 4:

Apply a coating of either Liquid Beeswax or Marseille Soap Paste.